To view this page ensure that Adobe Flash Player version 11.1.0 or greater is installed.

Dodge upcoming project reports E-mail: mcgraw-hill@merx.com Web: www.construction.com 201500622716 v2 Action stage: Bid Results Bid date: 09/08/2015 @ 12:00 PM CDT Valuation: F (500K to <750K) Project delivery system: Design-Bid-Build Owner type: State Project Overview Project type: Storm Sewer. Report type: Project & ITEM Sub project count: 0 First publish date: 09/04/2015 Prior publish date: 09/04/2015 Publisher: Dodge Data & Analytics Type of Work: Alterations Item Code: Culvert Pipe. Fabrication-Struc- tural Steel. Steel-Reinforcing. Steel-Struct,Fab and/or Erect. Item Category: SEWER/WATER PIPE. STRUCTURAL METAL. MISC/ORN METAL. STRUCTURAL METAL. Status: Bids in and under review - Award ex- pected in 30-60 days - Bid September 8 Status project delivery system: Design-Bid-Build Publish date: 09/15/2015 Key Contacts and Bid Documents Submit bids to: Owner (Public) Engineer: Manitoba Infrastructure & Trans- portation Contracts Services, Tenders 1700 Portage Avenue WINNIPEG, MB R3J 0E1 Phone:204-945-3776 E-mail: mit.eo.purchasing@gov.mb.ca, http://tgs.gov.mb.ca/ctsold/tenders.aspx Owner (Public): Manitoba Infrastructure & Transportation Contracts Services, Tenders 1700 Portage Avenue WINNIPEG, MB R3J 0E1 Phone:204-945-3776 E-mail: mit.eo.purchasing@gov.mb.ca, http://tgs.gov.mb.ca/ctsold/tenders.aspx Notes: DEWB86 Plans available from: Owner (Public) Additional features: DETOUR REMOVAL AND DETOUR CONSTRUCTION PTH 5, VARIOUS LOCATIONS ––––––––––––––––––––––––––––––––––– MTS Iceplex (Addition) 3969 Portage Ave WINNIPEG, MB R3K 1W4 CAN MB(DIVISION 11) 201500619506 v2 Action stage: Start Bid date: Valuation: $7,500,000 Project delivery system: Design-Bid-Build Target start date: 09/01/2015 Target complete date: 10/01/2016 Owner type: Private Project Overview Project type: Indoor Arena. Report type: Project Sub project count: 0 First publish date: 09/01/2015 Prior publish date: 09/01/2015 Publisher: Dodge Data & Analytics Type of Work: Additions Status: Local approvals in Place - September construction start anticipated - Completion for 2016/17 Hockey Season Status project delivery system: Design-Bid-Build Publish date: 09/15/2015 Key Contacts and Bid Documents Submit bids to: General Contractor Architect: Sink Combs & Dethlefs, Inc. Lindsey Peckingpaugh, AIA, LEED AP 4255 N Honore St CHICAGO IL 60613-4572 (USA) Phone:312-327-5158 Fax:312-335-1433 E-mail: lpeckingpaugh@sinkcombs.com, http://www.sinkcombs.com/ General Contractor: PCL Constructors Incor- porated Corey Mahoney, Project manager 1540 Gamble place Winnipeg, MB R3T 1N6 Phone:204-949-8900 Fax:204-287-2375 E-mail: WinnipegInquiries@pcl.com, http://www.pcl.com/Pages/default.aspx Internet Addr : http://www.pcl.com/Pages/de- fault.aspx Owner (Private): True North Sports & Enter- tainment Limited 345 Graham Winnipeg, MB R3C 5S6 Phone:204-987-7825 Fax:204-926-5555 E-mail: info@truenorth.mb.ca, http://www.mtscentre.ca/ Notes: CRCN03 Plans available from: General Contractor Structural Details Structural information: 1 Building/ 2 Stories above grade / 2 Stories below grade / 1,950 Total square meterftft / Building Frame: Struc- tural Steel Additional features: Two stroey 21000 square foot addition to accommodate Team Dressing Facilities - office space - operational staff space - storage space ––––––––––––––––––––––––––––––––––– ITEM: Temporary Roof Shoring (Water Treat- ment Plant) L4015 108 - 26th Street North BRANDON, MB R7B 0B5 CAN MB(DIVISION 07) 201500541588 v4 Action stage: Start Bid date: 06/09/2015 @ 02:00 PM CST Valuation: $258,693 Project delivery system: Design-Bid-Build Target start date: 07/01/2015 Owner type: Local Government Project Overview Project type: Water Treatment Plant. Report type: ITEM Only Sub project count: 0 First publish date: 06/01/2015 Prior publish date: 07/07/2015 Publisher: Dodge Data & Analytics Type of Item: ALTERATION. Item Code: Roofing-All Types. Item Category: ROOFING. Status: Contract awarded - Bid June 9 Status project delivery system: Design-Bid-Build Publish date: 09/15/2015 In co-operation with McGraw-Hill Construction Dodge, the Canadian Design and Construction Report provides information on upcoming projects in the region. New project reports and information on projects in the planning stages are up- dated daily for McGraw-Hill Construction Dodge subscribers. Data copyright 2015 McGraw-Hill Construction. Reprinted with permission. For more information, call 613-727-4900 ext 4902 or 4953. Key Contacts and Bid Documents Submit bids to: General Contractor Engineer: AECOM (formerlyUMA Engineer- ing Ltd) 99 Commerce Drive Winnipeg, MB R3P 0Y7 Phone:204-284-0580 Fax:204-475-3636 http://www.aecom.com/ General Contractor: Minty’s Moving Ltd P O Box 270 Onanole, MB R0J 1N0 Phone:204-848-2552 Fax:204-848-2275 E-mail: info@mintysmoving.ca Owner (Public): City of Brandon - Airport Services Procurement Manager, Treasury Department Site 520 box 36 RR 5 Brandon, MB R7A 5Y5 Phone:204-726-8546 Fax:204-726-8546 E-mail: purchorder@brandon.ca, http://www.brandon.ca Factor Name : City of Brandon (Purchasing Dept) Notes: CRCN02 - Bonds: 10% Bid Bond. 50% Performance Bond. 50% Payment Bond. Plans available from: Owner (Public) Items: Temporary Roof Shoring ––––––––––––––––––––––––––––––––––– Cartier Regional Water Co-Operative Water Treatment Plant MWSB 1155 unspecified location HEADINGLY, MB CAN MB(DIVISION 11) 201400585620 v15 Action stage: Construction Bid date: 08/01/2014 @ 11:00 AM CDT Valuation: $35,165,581 Project delivery system: Design-Bid-Build Target start date: 12/01/2014 Target complete date: 04/01/2016 Owner type: Private Project Overview Project type: Water Treatment Plant. Report type: Project Sub project count: 0 First publish date: 07/17/2014 Prior publish date: 08/13/2015 Publisher: Dodge Data & Analytics Type of Work: New Project Status: Contract award not available from reg- ular sources - Bids August 1 2014 Status project delivery system: Design-Bid-Build Publish date: 09/15/2015 Key Contacts and Bid Documents Submit bids to: Owner’s Agent (Pu) Architect: Stantec Architecture Saibal Basu, P.Eng 905 Waverley Street Winnipeg, MB R3T 5P4 Phone:204-489-5900 Fax:204-478-8981 E-mail: saibal.basu@stantec.com, http://www.stantec.com Email ID : saibal.basu@stantec.com Internet Addr : http://www.stantec.com Electrical Engineer: Stantec Architecture Saibal Basu, P.Eng 905 Waverley Street Winnipeg, MB R3T 5P4 Phone:204-489-5900 Fax:204-478-8981 E-mail: saibal.basu@stantec.com, http://www.stantec.com Email ID : saibal.basu@stantec.com Internet Addr : http://www.stantec.com General Contractor: Penn-Co Construction Ltd Ernie Penner, Principal PO Box 60 Blumenort, MB R0A 0C0 Phone:204-326-1341 Fax:204-326-4967 E-mail: info@mb.penn-co.com, http://www.penn-co.com Mechanical Engineer: Stantec Architecture Saibal Basu, P.Eng 905 Waverley Street Winnipeg, MB R3T 5P4 Phone:204-489-5900 Fax:204-478-8981 E-mail: saibal.basu@stantec.com, http://www.stantec.com Email ID : saibal.basu@stantec.com Internet Addr : http://www.stantec.com Owner (Private): Cartier Regional Water Co- op Bob Poirier, cao 1060 Highway 26 ST. FRANCOIS XAVIER, MB R4L 1A5 Phone:204-864-2092 Fax:204-864-2390 E-mail: cao@rm-stfrancois.mb.ca Email ID : cao@rm-stfrancois.mb.ca Owner’s Agent (Public): Manitoba Water Services Board Robin Lytle, Contract Authority 2022 Currie Blvd Box 22080 Brandon, MB R7A 6Y9 Phone:204-726-6096 E-mail: robin.lytle@gov.mb.ca, http://www.gov.mb.ca/ia/mwsb/mwsp.html Email ID : robin.lytle@gov.mb.ca Internet Addr : http://www.gov.mb.ca/ia/mwsb/mwsp.html Structural Engineer: Stantec Architecture Saibal Basu, P.Eng 905 Waverley Street Winnipeg, MB R3T 5P4 Phone:204-489-5900 Fax:204-478-8981 E-mail: saibal.basu@stantec.com, http://www.stantec.com Email ID : saibal.basu@stantec.com Internet Addr : http://www.stantec.com Notes: DEWB43 Plans available from: Owner’s Agent (Pu) Structural Details Structural information: 1 Building/ 1 Story above grade / 0 Story below grade / 1,750 Total square meter / Building Frame: Pre-En- gineered Metal Additional features: Construction of Cartier Regional Water Treatment Plant WTP in the RM of Headingley consisting of but not lim- ited to the following works - 4370 cubic meter below ground water storage reservoir - 1750 square meter pre-engineered WTP building - pre-selected membrane equipment - process mechanical - building HVAC - plumbing - electrical and instrumentation - raw water set- tling ponds and pumphouse - upgrade of exist- ing intake pumphouse - watermain connection to Headingley Correctional Centre - under- ground pipelines for raw water - settled raw water - sewage Estimate codes: B: $100,000-$199,999; C: $200,000-$299,999; D: $300,000-$399,999; E: $400,000-$4999,999; F: $500,000-$749,999; G: $750,000-$999,999; H: $1,000,000-$2,999,999; I: $3,000,000-$4,999,999; J: $5,000,000-$9,999,999; K: $10,000,000-$14,999,999; L: $15,000,000-$24,999,999; M: 25,000,000-$49,999,999; N: $50,000,000-No Maximum The Canadian Design and Construction Report — November 2015 – 49